Model: DONGFENG/EQ1125SJ8CDC
Emission standard: Euro 3
Power: 115kw
Wheel base:3800mm
Seat configuration: 2+3
Capacity: 4000kg water
Water suction pipeline: The water pump is equipped with a Φ100mm water inlet, which can absorb water from natural water sources or from liquid tanks.
Outlet pipeline: 1 water outlet on each side,there is a water cannon line with a diameter of 76mm through the tank to the top of the tank;
Water injection pipeline: 1 inner water injection pipeline of Φ76mm, which can directly inject water into the tank through the water pump,there is an external water injection port on each side of the body.
Remaining water discharge pipeline: In order to protect the water pump and each ball valve, a residual water discharge pipeline is installed in the pipeline, and each is equipped with a ball valve.
Cooling water pipeline: In order to make the power take-off cope with various complicated situations during operation, the pipeline is equipped with a cooling water pipeline and a stainless steel ball valve in the inlet and outlet pipelines.
Type: Full Power Sandwich PTO
Cooling method: forced water cooling
Lubrication method: splash oil lubrication
Material: High-quality steel frame
Structure: The inner part of the equipment box adopts a steel structure, which is firm and reliable, and improves the space utilization rate and variability.
Door opening: There are aluminum alloy rolling doors on the left and right sides of the equipment box, which are light and reliable, and have low noise.
A long row of warning lights be used in front of the roof (located at the top of the cab);
The upper sides of the vehicle are equipped with strobe lights; the lower side installed with safety signs;
The power of the siren is 100W; the circuits of siren, warning light and strobe light are independent additional circuits, and the control device is installed in the cab.